Main employer: Continental Plateau Oil Company of Iran
Executive: Khatam Al-Anbia construction site - Darya Sahel Institute
Buyer: Khatam Al-Anbia construction site - Darya Sahel Institute
Project implementation year: 2009
Siri Island is located about 72 km south of Bandar Lange and 40 km west of Abu Musa Island, and the area of the island is about 18 square kilometers.
The oil fields of Siri region are as follows:
Alvand Field: It is located 50 km west of Siri Island and includes two well platforms. The oil of this field is transferred to Kish Island after mixing with the oil of Sivand, Dana and Nusrat fields.
Nusrat Joint Field: This field has five production wells and the produced oil is transferred from the field to the Nasr platform. It is necessary to inform that oil from Sivand, Dana, Nusrat and Alvand fields is collected in the Nasr platform and transferred to Siri Island.
Esfand Oil Field (Series E): Esfand oil field is located 18 km southeast of the island and includes 5 offshore platforms consisting of 3 well platforms, an exploitation platform and a torch platform, which will be transferred to the island after extraction.
Sivand (Series C) and Dana (Series D) Oil Fields: Sivand oil field with 18 wells and Dana field with 24 wells are located in the west of Siri Island.
Forozan Common Field: This field is located 100 km southeast of Khark Island. Forozan field has 53 wells and is shared with Marjan field (Arabia).
This company is proud to inform that it has cooperated with Darya Sahil company in the projects of Siri E, C, D platforms for the production of GRP cable trays and ladders.